Jump to content

Dahod railway station

Coordinates: 22°50′37″N 74°15′15″E / 22.843725°N 74.254122°E / 22.843725; 74.254122
From Wikipedia, the free encyclopedia

Dahod
Indian Railways station
Indian Railways logo
General information
LocationGodi Road, Dahod, Gujarat
 India
Coordinates22°50′37″N 74°15′15″E / 22.843725°N 74.254122°E / 22.843725; 74.254122
Elevation314 m (1,030 ft)
Owned byIndian Railways
Operated byWestern Railways
Line(s)New Delhi–Mumbai main line
Platforms3
Tracks7
ConnectionsAuto stand
Construction
Structure typeStandard (on ground)
ParkingYes
AccessibleDisabled access Available
Other information
StatusFunctioning
Station codeDHD
Zone(s) Western Railway zone
Division(s) Ratlam
History
ElectrifiedYes
Location
Dahod railway station is located in Gujarat
Dahod railway station
Dahod railway station
Location within Gujarat
Dahod railway station is located in India
Dahod railway station
Dahod railway station
Dahod railway station (India)

Dahod railway station (station code: DHD) is a railway station serving Dahod town, in Dahod district of Gujarat state of India. It is under Ratlam railway division of Western Railway zone of Indian Railways. It is located on New Delhi–Mumbai main line of the Indian Railways.[1][2]

Dahod is well connected by rail to Indore Junction, Bhopal Junction, Jabalpur Junction, Hazrat Nizamuddin, Jaipur Junction, Udaipur City, Ahmedabad Junction, Amritsar Junction, Shri Mata Vaishno Devi Katra, Dehradun, Mumbai Central, Muzaffarpur Junction, Firozpur Cantonment, Varanasi Junction.

The Dahod–Indore Rail Project is scheduled for completion at the end of 2022. Dahod will be connect to Indore through Dhar and Jhabua. Dahod–Indore Rail Project is 204.76 km long.[3][4]

Trains

[edit]

The following Passenger, MEMU, and Superfast trains start from here:

References

[edit]
  1. ^ "Dahod Railway Station (DHD) : Station Code, Time Table, Map, Enquiry". India: NDTV. Retrieved 21 January 2019.
  2. ^ "DHD/Dahod". India Rail Info.
  3. ^ "Indore–Dahod Project: पीथमपुर में 150 करोड़ में बनेगी 60 फीट नीचे 3 किमी सुरंग". नई दुनिया.
  4. ^ "इंदौर-दाहोद रेल ट्रैक / धार-झाबुआ के बीच अलाइनमेंट बदलकर टनल को किया आधा, छह साल का प्रोजेक्ट तीन साल में होगा पूरा". Dainik Bhaskar.